ECOLOGICAL VERIFICATION DATE: JAN 2025

Symbiosis Success:
Ecological Flow Verification

The Mission: A Run-of-River plant faced regulatory shutdown due to unproven ecological flow. Our objective: Restore public trust and secure the operating license through transparent, digital data.

MISSION STATUS:
VERIFIED
License Status
100%

Permanently Secured

Passage Efficiency
+50%

Migration Success

Public Trust
HIGH

Community Approved

01 The Threat Vector

Regulators cited failures in demonstrating continuous adherence to Ecological Flow (E-Flow) standards. The plant relied on outdated, manual sampling that lacked credibility. The hidden risk was not just legal, but reputational: a perception that the plant was prioritizing profit over river health, threatening its social license to operate.

> RISK DETECTED: UNVERIFIED ECOLOGICAL IMPACT
> CONSEQUENCE: IMMEDIATE SHUTDOWN THREAT

02 Tactical Execution

We deployed the AnoHUB Symbiosis Protocol to create transparency:

  • Digital Flow Verification Installed high-precision, tamper-proof flow sensors in bypass sections and minimum flow outlets, providing continuous, time-stamped proof of compliance.
  • Fish Passage Optimization Conducted transient flow analysis within the existing fish ladder to ensure optimal velocity and minimized turbulence, improving passage efficiency for local species.
  • Automated Reporting Enabled the AnoHUB platform to generate instant compliance reports, linking operational data directly to regulatory requirements in real-time.