Electro-Erosion Stopped:
M-E Synergy Success
The Mission: A Vertical Pelton unit suffered recurring, unexplained bearing failures despite perfect mechanical alignment. Our objective: Identify the invisible electrical culprit destroying the mechanical core.
NEUTRALIZED
Shaft Voltage Eliminated
Bearing Life Extended
Instant Payback
01 The Threat Vector
The client faced consistent micro-pitting and catastrophic failures in their generator bearings (every 6 months), despite using high-quality components and optimal lubrication. Mechanical checks showed zero misalignment.
> RISK DETECTED: ELECTRO-DISCHARGE MACHINING (EDM)
> CAUSE: IMPROPER GROUNDING "SYNERGY GAP"
02 Tactical Execution
We deployed the AnoHUB M-E Synergy Protocol to trace the invisible current:
-
Forensic Electrical Audit Used specialized shaft voltage brushes and oscilloscopes to trace stray currents across the generator assembly, confirming voltage spikes > 1.5V on the shaft.
-
Grounding Re-Bonding Corrected inadequate bonding on critical generator components (stator frame to ground) to redirect fault currents safely to earth, neutralizing the root cause.
-
Insulated Bearings Installed new, electrically insulated bearings as a permanent physical barrier against future current leaks, ensuring fail-safe protection.